So it feels like a very sad Saturday today. There is little that can be done. I want to continue with the completion of the Bassline Generator and let the day pass.
After all the top stuff was in place, then came the plastic jack to be fixed up. Notice where it is positioned, underneath the 100K trim pot so the ends of the pot needed a good trim.
On the underside of the PCB board you can see the send/recieve LED's (given the length to fit inside the wooden box) and the batery pack and jack plug.
Here we have the four plastic legs or stands fixed in place with nuts.
Oddly I realised that I had missed inserting the other chip socket so got this inplace and soldered. The instructions didn't mention about the 6-pin ISP header so this was sorted at this stage. I was unsure of the polarity so went with intuition.
After all points were checked the chips were inserted by bending the legs slightly in to allow for ease in pushing into the holders. The knobs were put on and here is the finished article!
No comments:
Post a Comment